Monthly Archive: October 2010

Oct
31

Apprentice Blogger – How To Trust

I thought I would post a little blog post about a colleagues blog and give her a link and hopefully some traffic. Becky Pursey is writing a blog ‘How to Trust‘ initially dedicated to writing about trust in relationships, but I know she has bigger plans for her blog eventually. Becky is very new to …

Continue reading »

Oct
30

Labgear Dual Brushed Media Faceplate

Labgear Dual Brushed Media Faceplate

I have been looking for a solution to tidy up the media wires behind the television in the new Orangery Kitchen extension. The television will be wall mounted at about 1300mm off the ground, we will also have a media centre PC running windows 7 media centre tucked away under a cupboard in the centre …

Continue reading »

Oct
29

Pointing And Preparing The Walls

I have spent the last two evenings filling gaps in the back wall of the house that were left by plumbers. Although in theory these did not matter as they were behind the pitched roof, we have always had drafts into the bathroom and this looks a likely cause. These missing bricks should be behind …

Continue reading »

Oct
28

White Recessed Spot Lights Don’t Look Great

We liked the idea of having white recessed spot lights in the up stands into the orangery window. I have bought some samples from Screwfix and it appears that white will not be the ones to go for. We like the idea of white as they would be discrete and not spoil the lines of …

Continue reading »

Oct
27

Lighting Decisions And Orangery Project Update

Downlight

We have been putting off the decision as to what lighting we want in the new orangery. We have been passing ideas around for a while. Do we have a drop light from the middle of the Orangery roof? If we were to do that it would have to be something rather grand so as …

Continue reading »

Oct
27

50,000 Words And Still Counting

Ok so I rabbit on about nothing for much of the time on this blog, but having recently passed the 30,000 and 40,000 word marks I have just noticed that I have now reached 50,000 words on this blog. This means that in a month and a half I have written 10,000 words. Good progress …

Continue reading »

Oct
25

Protected: Video – Demolition On The Kitchen – Ask For Password

There is no excerpt because this is a protected post.

Oct
25

Orangery Extension Part 9: Walls Finished, Roofs Off And Walls Down

IMG_4139

I have not posted an update for a few days for various reasons. Mainly due to pressures of time. There has been a great deal happening on the project since I last posted, not least the build phase of the project is finished and we have demolished the existing kitchen roof and walls to make …

Continue reading »

Oct
20

Protected: Wedding Video – Ask For Password

There is no excerpt because this is a protected post.

Oct
18

Orangery Extension Part 8: Walls Going Up

IMG_3987

Conservatec were on site again at 7:15 today, the plan was to start on the walls, they have made great progress concentrating on the garage side. We can now see the door way starting to be established. You can really see the difference now, that site is up to just over 4ft. The bricks are …

Continue reading »

Older posts «